What a welding inspector checks before the first arc

Ask someone outside the trade what a welding inspector does and they’ll usually say “looks at welds”. That’s part of it. But on a well-run job, the most useful inspection happens before anyone strikes an arc. By the time a weld is finished, the only options left are accept it, repair it or cut it out.

This is the checklist our inspectors work through at the start of a fabrication job.

Is there an approved procedure for this joint?

Every production weld should be covered by a welding procedure specification (WPS) that’s been qualified for the material, thickness range, position and process being used. It sounds obvious, but we regularly find a WPS written for 12 mm plate being used on 40 mm, or a procedure qualified in the flat position being used overhead. The WPS should also be approved by the client where the contract asks for it.

Is the welder qualified for it?

Welder qualifications have limits too: process, position, thickness, diameter and sometimes the filler metal group. They also lapse if the welder hasn’t used the process for a set period – six months under the common codes – unless continuity is recorded. We check the welder’s ID against the qualification record, not just the name on a list.

Are the consumables right – and dry?

The electrode or wire should match the WPS, with certificates on file. Low-hydrogen electrodes need to be stored in a heated oven once opened and kept in a quiver on the job. In Guyana’s humidity, an open tin of E7018 left on a bench for a day can pick up enough moisture to cause hydrogen cracking in thicker or harder steels.

Is the material what it should be?

Heat numbers on the plate or pipe should match the mill certificates. Mix-ups between similar-looking grades happen more often than anyone likes to admit, especially when offcuts from different jobs share a rack.

Is the fit-up right?

Root gap, root face, bevel angle, alignment and hi-lo should all be inside the WPS and code tolerances. Fit-up is where a lot of lack-of-fusion and incomplete penetration starts. Five minutes with a gauge here saves hours of gouging later.

Is preheat needed – and checked?

Thicker sections and higher carbon-equivalent steels need preheat. The inspector checks it with a contact thermometer or temperature crayons at the right distance from the joint, and checks it again between passes.

Why it’s worth paying for

Every item on this list is cheaper to fix before welding than after. When an inspector catches a wrong consumable on day one, it costs a phone call. When it’s found after radiography on fifty joints, it costs a schedule.