Inspecting padeyes and lifting lugs before a lift

Padeyes and lifting lugs are small pieces of steel that carry a lot of responsibility. When a skid, a module or a spool is lifted, every tonne goes through a few welds and a hole in a plate. If one of those welds has a crack, the lift is where you find out.

That’s why most lifting procedures call for inspection of padeyes before use – and why it’s one of the most common NDT jobs we do.

Where padeyes crack

Cracks almost always start at the weld toe where the padeye meets the main structure, or at the edge of the pin hole. The toe is a stress concentration on top of a weld; the hole sees bearing stress from the shackle pin. Lamination in the parent plate under the padeye is another concern on thicker steel, because the load pulls through the plate thickness.

What a typical inspection includes

  • Visual inspection of the weld size, profile and any undercut, plus the condition of the pin hole – elongation, gouges or wear.
  • Dimensional checks against the design drawing: plate thickness, hole diameter, cheek plates and weld size.
  • Magnetic particle testing of the full weld length and the area around the hole to find surface cracks.
  • Ultrasonic testing of full-penetration welds, and of the parent plate under the padeye where through-thickness loading is a concern.

New versus existing padeyes

On new fabrication, padeyes should be inspected after welding and before the first lift, with the inspection recorded and traceable to the drawing. On existing equipment that has been lifted many times, or that has been sitting outdoors in a corrosive marine climate, periodic re-inspection is just as important. Corrosion at the weld toe and pitting in the pin hole reduce capacity in ways that aren’t always obvious from a distance.

Paperwork matters

Lifting operations on oil & gas projects are tightly controlled. The lift plan will usually need evidence that the padeyes were inspected, by whom, to what procedure, with what result. A clear report with the padeye ID, method, acceptance standard and photos saves time when the lifting supervisor asks for it.

Plan the inspection before the crane arrives

The most common problem we see isn’t a cracked padeye – it’s an uninspected one on the morning of a lift, with a crane on hire and a crew standing by. Book the inspection when fabrication finishes, not when the crane is already on site.